RSS were asked to provide technical assistance to take down a 150ft tower in Cardiff. Once they provided the information required they were also asked to assist in the lift.
RSS team slinging tower.
200t Crane top/tail load.
Alstom, Ainscough and RSS team photo.
Gas Pipe Line
RSS were contracted to carry out the on site inspections and tests. We also supplied lifting equipment and played our part to make sure the project, which is one of the largest in the UK, was completed on time.
40tonne 5mtr polyester web sling supplid by RSS.
LNG Plant
RSS supplied Besix Kier with 60tonne four leg wire rope sling. To assist in the re-build of the jetty.